Key figures

  • High-quality single train Siemens plant, designed for yearly electricity production of up to 3.5 TWh (ca. 600 million Sm3 annual gas consumption)
  • 280 MW Siemens SGT5 4000F Gas Turbine (low NOx), 24,000 EOH, overhauled 2011 and with only few EOHs until it was mothballed 2014
  • Siemens SST5-5000 Steam Turbine,
  • Balke-Dürr Heat Recovery Steam Generator (125/30/4 bar)
  • SGen5-2000H Generator (520 MVA, 50 Hz) and Transformer (20/310 kV)
  • Fuel Gas Supply System, Cooling Water System, Water Treatment System
  • Gas Turbine and Generator fully maintained under Long Term Service Agreement with Siemens
  • Startup in December 2007, Hot Gas Path Inspection (extended) in 2011 directly followed by Standby Mode
  • Placed in Cold Reserve in Autumn 2014 with dry preservation
  • Significant spare parts inventory available